BARRY YOUNG
Location: Whangarei, Northland, New Zealand
Date: 2018
Terrain: Easy Contour
Infrastructure
– Ground Base Operation
– 2 Skid Sites
“F360 did a great job of scheduling our smaller block in between the bigger jobs they were working on to help us take advantage of machinery being close by. They came in, got the job done and the clean up was good including tying up some loose ends over the Christmas break.“
Background
- Block Size: 6Ha
- Large scale dairy farmer
- F360 recommended by a trusted friend and farming neighbours
- Small blocks were scheduled in amongst other adjacent sites
- This reduced costs and cartage of gear and machinery for client
Response
- F360 accurately matched their yield tonnage expectations
- Client felt satisfied despite being a small block owner
- Block was completed promptly and on time before winter weather set in